# Aide 任务执行
|
|
|
|
|
|
|
|
|
|
|
|
你正在执行 Aide 任务执行流程。这是核心命令,整合了任务准备和任务执行。
|
|
|
|
|
|
|
|
|
|
|
|
## 参数
|
|
|
|
|
|
|
|
|
|
|
|
- `$ARGUMENTS`:任务文档路径(可选)
|
|
|
|
|
|
- 未传入时根据 flow 状态决定行为
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 前置准备
|
|
|
|
|
|
|
|
|
|
|
|
**首先触发 `aide` skill 学习 aide 命令的使用方法。**
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 开始
|
|
|
|
|
|
|
|
|
|
|
|
### 检查 flow 状态
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow status
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
根据状态决定行为:
|
|
|
|
|
|
|
|
|
|
|
|
- **无活跃任务** 或 **当前任务已 finish** → 进入**新任务流程**
|
|
|
|
|
|
- **当前任务未完成** → 进入**续接流程**
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 新任务流程
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 1:任务准备 (task-optimize)
|
|
|
|
|
|
|
|
|
|
|
|
#### 1.1 启动流程追踪
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow start task-optimize "开始任务准备: <任务简述>"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
#### 1.2 确定任务文档
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
# 如果传入了参数
|
|
|
|
|
|
任务文档 = $ARGUMENTS
|
|
|
|
|
|
|
|
|
|
|
|
# 如果未传入参数,使用配置默认值
|
|
|
|
|
|
aide config get task.source
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
读取任务文档内容。如文档不存在,询问用户提供任务内容。
|
|
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
#### 1.3 口语化内容检测
|
|
|
|
|
|
|
|
|
|
|
|
检查任务文档或用户对话是否具有以下口语化特征:
|
|
|
|
|
|
|
|
|
|
|
|
- 使用非正式的口头表达方式
|
|
|
|
|
|
- 包含大量模糊表述("我觉得"、"好像"、"大概"、"应该"等)
|
|
|
|
|
|
- 句子结构松散,缺乏条理性
|
|
|
|
|
|
- 包含冗余或重复的表达
|
|
|
|
|
|
- 思维跳跃,逻辑不连贯
|
|
|
|
|
|
|
|
|
|
|
|
**如果检测到口语化特征**:
|
|
|
|
|
|
|
|
|
|
|
|
1. 触发 `task-parser` skill 学习口语化内容解析方法
|
|
|
|
|
|
2. 按照 skill 指南对内容进行深度理解和规范化转换
|
|
|
|
|
|
3. 将转换后的结构化内容作为后续分析的基础
|
|
|
|
|
|
|
|
|
|
|
|
> 即使内容部分口语化,也应进行解析,提取核心意图
|
|
|
|
|
|
|
|
|
|
|
|
#### 1.4 任务分析
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
2025-12-15 21:48:00 +08:00
|
|
|
|
##### 深度理解任务
|
|
|
|
|
|
|
2025-12-15 18:15:56 +08:00
|
|
|
|
- 任务要解决什么问题?
|
|
|
|
|
|
- 最终交付物是什么?
|
|
|
|
|
|
- 成功的标准是什么?
|
|
|
|
|
|
- 涉及哪些模块/系统?
|
2025-12-15 21:48:00 +08:00
|
|
|
|
- 是否有技术难点?
|
|
|
|
|
|
|
|
|
|
|
|
##### 分析项目环境
|
|
|
|
|
|
|
|
|
|
|
|
根据需要阅读相关代码/文档,理解任务与项目现有结构的关系。
|
|
|
|
|
|
|
|
|
|
|
|
> 复杂任务(多子目标、多方案对比)建议使用 sequential-thinking 进行结构化分析
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
#### 1.5 复杂度评估
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
|
|
|
|
|
根据**任务复杂度评估指导原则**(见附录)评估任务复杂度:
|
|
|
|
|
|
|
|
|
|
|
|
- **简单/中等任务**:直接生成任务细则
|
|
|
|
|
|
- **复杂/超大任务**:拆分为多个子计划
|
|
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
#### 1.6 任务优化
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
2025-12-15 21:48:00 +08:00
|
|
|
|
##### 准确性优化
|
|
|
|
|
|
|
|
|
|
|
|
- 识别**歧义**和**不明确之处**
|
|
|
|
|
|
- 识别**隐含假设**和**未说明的前提**
|
|
|
|
|
|
- 明确任务**边界**
|
|
|
|
|
|
|
|
|
|
|
|
##### 简洁性优化
|
|
|
|
|
|
|
|
|
|
|
|
- 识别**冗余表述**
|
|
|
|
|
|
- 区分**真冗余**与**必要强调**
|
|
|
|
|
|
|
|
|
|
|
|
##### 可执行性优化
|
|
|
|
|
|
|
|
|
|
|
|
- 将抽象要求转化为**具体步骤**
|
|
|
|
|
|
- 确保每个步骤有明确的**输入、输出、验证标准**
|
|
|
|
|
|
- 识别可能的**替代方案**
|
|
|
|
|
|
|
|
|
|
|
|
##### 生成待定项
|
|
|
|
|
|
|
|
|
|
|
|
对于存在多种方案、有歧义、需要用户确认的内容,准备待定项数据。
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
#### 1.7 待定项处理(如有)
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide decide submit .aide/pending-items.json
|
|
|
|
|
|
# 用户完成后
|
|
|
|
|
|
aide decide result
|
|
|
|
|
|
```
|
|
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
#### 1.8 生成任务细则
|
2025-12-15 18:15:56 +08:00
|
|
|
|
|
|
|
|
|
|
产出任务细则文档,保存到配置的路径。
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "任务准备完成"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 2:流程设计 (flow-design)
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-part flow-design "进入流程设计环节"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
#### 2.1 制定执行计划
|
|
|
|
|
|
|
|
|
|
|
|
- 具体的实现步骤
|
|
|
|
|
|
- 每个步骤的预期产出
|
|
|
|
|
|
- 潜在风险和应对方案
|
|
|
|
|
|
|
|
|
|
|
|
#### 2.2 创建流程图
|
|
|
|
|
|
|
|
|
|
|
|
在配置的流程图目录创建 PlantUML 源文件:
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide config get flow.diagram_path
|
|
|
|
|
|
```
|
|
|
|
|
|
|
2025-12-16 20:29:15 +08:00
|
|
|
|
##### 流程图类型
|
|
|
|
|
|
|
|
|
|
|
|
根据任务类型,需要创建不同类型的流程图:
|
|
|
|
|
|
|
|
|
|
|
|
| 类型 | 适用场景 | 必需性 |
|
|
|
|
|
|
|------|----------|--------|
|
|
|
|
|
|
| 任务执行流程图 | 所有任务 | **必需** |
|
|
|
|
|
|
| 程序逻辑流图 | 含程序设计与代码编写的任务 | **必需** |
|
|
|
|
|
|
|
|
|
|
|
|
##### 任务执行流程图规范
|
|
|
|
|
|
|
|
|
|
|
|
展示任务执行的步骤顺序:
|
|
|
|
|
|
|
|
|
|
|
|
- **步骤分解**:将任务分解为具体的执行步骤
|
|
|
|
|
|
- **顺序关系**:明确步骤之间的先后顺序
|
|
|
|
|
|
- **决策点**:标注关键决策点和分支条件
|
|
|
|
|
|
- **依赖关系**:体现步骤之间的依赖
|
|
|
|
|
|
|
|
|
|
|
|
##### 程序逻辑流图规范
|
|
|
|
|
|
|
|
|
|
|
|
展示程序代码的执行逻辑(仅限程序类任务):
|
|
|
|
|
|
|
|
|
|
|
|
- **入口点**:从程序入口函数(如 main、\_\_main\_\_)开始
|
|
|
|
|
|
- **控制结构**:体现顺序、分支(if/switch)、循环(for/while)结构
|
|
|
|
|
|
- **语义化抽象**:将代码逻辑抽象为人类可理解的业务描述,而非代码细节
|
|
|
|
|
|
- **模块化表示**:
|
|
|
|
|
|
- 函数/模块表示为"盒子"
|
|
|
|
|
|
- 标注预期输入和输出
|
|
|
|
|
|
- 复杂函数可单独绘制详图
|
|
|
|
|
|
- **层次化组织**:
|
|
|
|
|
|
- 主流程图展示程序整体执行流
|
|
|
|
|
|
- 关键子系统/模块可单独绘制详细流程图
|
|
|
|
|
|
- 通过引用关联主图与详图
|
|
|
|
|
|
|
|
|
|
|
|
> **为什么需要程序逻辑流图**:
|
|
|
|
|
|
> - 用户可以通过流程图快速理解程序的执行逻辑
|
|
|
|
|
|
> - 在流程图阶段发现业务逻辑错误,避免实现后才发现方向错误
|
|
|
|
|
|
> - 比逐行审阅代码更高效
|
|
|
|
|
|
|
|
|
|
|
|
##### 流程图示例结构
|
|
|
|
|
|
|
|
|
|
|
|
```plantuml
|
|
|
|
|
|
@startuml
|
|
|
|
|
|
' 主程序流程图
|
|
|
|
|
|
start
|
|
|
|
|
|
:初始化配置;
|
|
|
|
|
|
:解析命令行参数;
|
|
|
|
|
|
|
|
|
|
|
|
if (参数有效?) then (是)
|
|
|
|
|
|
:调用处理模块;
|
|
|
|
|
|
note right: 详见 process-module.puml
|
|
|
|
|
|
else (否)
|
|
|
|
|
|
:显示错误信息;
|
|
|
|
|
|
stop
|
|
|
|
|
|
endif
|
|
|
|
|
|
|
|
|
|
|
|
:输出结果;
|
|
|
|
|
|
stop
|
|
|
|
|
|
@enduml
|
|
|
|
|
|
```
|
|
|
|
|
|
|
2025-12-15 18:15:56 +08:00
|
|
|
|
**所有任务必须有流程图**,用于:
|
|
|
|
|
|
- 规范化思考
|
|
|
|
|
|
- 方便用户审阅
|
|
|
|
|
|
- 早期发现逻辑错误
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "流程图设计完成"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
#### 2.3 进入实现环节
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-part impl "流程设计完成,进入实现环节"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
> aide flow 会自动校验 PlantUML 并生成 PNG
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 3:迭代实现 (impl)
|
|
|
|
|
|
|
|
|
|
|
|
按计划执行,每完成一个步骤:
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "<完成内容简述>"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
遇到问题时:
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow issue "<一般问题>"
|
|
|
|
|
|
aide flow error "<严重错误>"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
需要回退时:
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow back-step "<原因>"
|
|
|
|
|
|
aide flow back-part <环节名> "<原因>"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 4:验证交付 (verify)
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-part verify "实现完成,进入验证环节"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
- 对照任务细则验证每个成功标准
|
|
|
|
|
|
- 执行测试(如适用)
|
|
|
|
|
|
- 验证失败则回退修复
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "验证完成: <验证结论>"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 5:文档更新 (docs)
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-part docs "验证通过,进入文档环节"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
更新相关文档:
|
|
|
|
|
|
- `README.md`(如有用户可见变更)
|
|
|
|
|
|
- `CHANGELOG.md`
|
|
|
|
|
|
- 其他相关文档
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "文档更新完成"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
### 阶段 6:收尾 (finish)
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-part finish "文档更新完成,进入收尾"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
- 清理临时文件
|
|
|
|
|
|
- 检查遗漏的 TODO
|
|
|
|
|
|
- 向用户汇报完成情况
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "任务完成"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 续接流程
|
|
|
|
|
|
|
|
|
|
|
|
当检测到未完成的任务时:
|
|
|
|
|
|
|
|
|
|
|
|
### 1. 分析当前进度
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow status
|
|
|
|
|
|
aide flow show <task_id>
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
了解:
|
|
|
|
|
|
- 当前处于哪个环节
|
|
|
|
|
|
- 已完成哪些步骤
|
|
|
|
|
|
- 最后的操作是什么
|
|
|
|
|
|
|
|
|
|
|
|
### 2. 载入项目认知
|
|
|
|
|
|
|
|
|
|
|
|
调用 `/aide:load` 的逻辑,按需载入项目文档。
|
|
|
|
|
|
|
|
|
|
|
|
### 3. 读取任务细则
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide config get task.spec
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
读取任务细则,了解任务目标和计划。
|
|
|
|
|
|
|
|
|
|
|
|
### 4. 继续执行
|
|
|
|
|
|
|
|
|
|
|
|
根据当前环节,从中断处继续执行。
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 复杂任务的子计划执行
|
|
|
|
|
|
|
|
|
|
|
|
对于拆分为多个子计划的复杂任务:
|
|
|
|
|
|
|
|
|
|
|
|
### 执行模式
|
|
|
|
|
|
|
|
|
|
|
|
```
|
|
|
|
|
|
task-optimize → [flow-design → impl → verify → docs] × N → finish
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
### 流程
|
|
|
|
|
|
|
|
|
|
|
|
1. 完成 task-optimize,生成任务导览和所有子计划细则
|
|
|
|
|
|
2. 对每个子计划:
|
|
|
|
|
|
- 进入 flow-design,为该子计划设计流程图
|
|
|
|
|
|
- 进入 impl,实现该子计划
|
|
|
|
|
|
- 进入 verify,验证该子计划
|
|
|
|
|
|
- 进入 docs,更新该子计划相关文档
|
|
|
|
|
|
- 标记子计划完成,更新任务导览
|
|
|
|
|
|
3. 所有子计划完成后,进入 finish
|
|
|
|
|
|
|
|
|
|
|
|
### 子计划切换
|
|
|
|
|
|
|
|
|
|
|
|
完成一个子计划的 docs 后:
|
|
|
|
|
|
|
|
|
|
|
|
```bash
|
|
|
|
|
|
aide flow next-step "子计划 N 完成,开始子计划 N+1"
|
|
|
|
|
|
aide flow back-part flow-design "开始下一个子计划的流程设计"
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## 附录:任务复杂度评估指导原则
|
|
|
|
|
|
|
|
|
|
|
|
### 评估维度
|
|
|
|
|
|
|
|
|
|
|
|
1. **结构维度**:模块数量、文件数量、依赖关系
|
|
|
|
|
|
2. **逻辑维度**:业务复杂度、状态管理、边界条件
|
|
|
|
|
|
3. **集成维度**:外部依赖、数据格式、兼容性
|
|
|
|
|
|
4. **风险维度**:技术风险、影响范围、回滚难度
|
|
|
|
|
|
|
|
|
|
|
|
### 复杂度等级
|
|
|
|
|
|
|
|
|
|
|
|
| 等级 | 特征 | 处理方式 |
|
|
|
|
|
|
|------|------|----------|
|
|
|
|
|
|
| 简单 | 单文件或少量文件,逻辑清晰 | 直接执行 |
|
|
|
|
|
|
| 中等 | 2-4 个模块,有一定依赖 | 直接执行,注意顺序 |
|
|
|
|
|
|
| 复杂 | 5+ 模块,复杂依赖 | **拆分为子计划** |
|
|
|
|
|
|
| 超大 | 10+ 模块,全面重构 | 拆分为独立任务 |
|
|
|
|
|
|
|
|
|
|
|
|
### 拆分判断标准
|
|
|
|
|
|
|
|
|
|
|
|
满足以下任一条件时应拆分:
|
|
|
|
|
|
1. 涉及 3 个以上独立功能模块
|
|
|
|
|
|
2. 任务自然分为多个可独立交付的阶段
|
|
|
|
|
|
3. 存在高风险环节,需要阶段性验证
|
|
|
|
|
|
4. 存在明确的前后依赖关系
|
|
|
|
|
|
5. 单次对话可能无法完成
|